Roof Replacement
Agency: | POSTAL SERVICE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159727693138874 |
Posted Date: | Oct 27, 2022 |
Due Date: | Dec 5, 2022 |
Solicitation No: | 089495-23-A-0008 |
Source: | https://sam.gov/opp/af8b68764d... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Oct 27, 2022 11:18 am EDT
- Original Date Offers Due: Dec 05, 2022 03:00 pm EST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Dec 20, 2022
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 1005 - GUNS, THROUGH 30MM
-
NAICS Code:
- 238160 - Roofing Contractors
-
Place of Performance:
Columbus , OH 43228USA
The scope of work is indicated on Drawing G1.1 and the Roof Plan drawing(s).
1. Additional Scope:
a. The contractor shall provide, as a part of his contract, a designated person who will be
stationed inside the post office, directly beneath the area of work, for the duration of said
work, with the sole purpose of collecting or cleaning up any debris which may fall from the
existing ceiling interior as a result of the work being done above. The contractor shall
provide and install removable covers for protection for all equipment and materials inside
the post office during the roofing work. Covers are to be suspended from supports or the
roof structure above all postal equipment. Postal employees must be allowed to work
under the covers so as to not impede postal operations in any way. In areas exposed to
structure and other interior areas likely to experience dust and/or debris falling, install 6
mil. anti-static poly sheeting attached to overhead structure, do not drape over equipment.
To the extent possible, Contractor is to inspect interior side of roof deck and determine
any items that are attached to or in close proximity to deck. Contractor shall take action
as required to avoid damage to such items.
b. The contractor is to remove any/all water damaged interior ceiling material (acoustical tile,
gypsum board, plaster), and provide new material to match existing conditions in all
rooms/areas below the roof area being replaced under the scope of work. Color of new
material or paint to match existing conditions. Where painting is required, apply one coat
of latex interior primer and two coats of latex interior finish paint. Sheen to match existing
conditions. Contractor to verify all quantities of ceiling replacement work required prior to
bidding.
C. All work shall be in accordance with applicable codes and local regulations that may apply. In
case of conflict in or between the Contract Documents and a governing code or ordinance, the
more stringent standard shall apply.
1.3 MISCELLANEOUS CONTRACT EXPENSES
A. In accordance with the terms and conditions of the contract provisions and clauses, including those
concerning Permits and Responsibilities and, Building Codes, Fees and Charges, the Contractor must
include in its price proposal a separate line item for the cost each of the of the following fees or
charges payable to State, local, or special community development agencies:
Off-site inspection fees
Environmental Permits/Registrations
Other permits or fees
B. If the actual cost of any item identified above is more or less than the amount listed, the contract
price will be adjusted accordingly by a contract modification. The adjustment will not include
overhead and profit. The Contractor must, within 30 days after incurring the expenses, inform the
011000 Attachment A – Page 2
POSTAL SERVICE
USPS Date: 10/1/2015 FURNISHED EQUIPMENT
Contracting Officer that the payment has been made. Evidence of the actual amount paid must
be provided. The contract amount will be adjusted upward or downward as necessary to
accommodate actual charges from the utilities. The Contractor must provide all coordination with
the utilities in accomplishing their work and must make all payments to the utilities for their work.
C. The Contractor must include all additional fees, as required, in the price proposal.
- 615 CHESTNUT ST PO BOX 40592
- PHILADELPHIA , PA 19197
- USA
- Andrea VanKuren
- andrea.r.vankuren@usps.gov
- Ryan Price
- ryan.d.price@usps.gov
- Oct 27, 2022 11:18 am EDTCombined Synopsis/Solicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.